..........................................................................................................................................................................................
 
REFECTORY BUILDING MATERIAL ARRIVES    
 
 

4th November 2007

Friday evening of 2nd November 2007 brought smiles to the people of Andiamo Trust more especially the students doing studies in the education departments of the trust when the long awaited container arrived.

The container's arrival was a full answer to the problems that the student have been encountering when taking their meals because it carried with it building materials for the student's refectory.

Previously students used to have their meals in one small room at the old Technical Campus which was being used both as a refectory and entertainment room. Due to the size of the room, there has been alot of problems mainly during the rainy season and classes would start abit late as students could give spaces for others to first take their meals.
Andiamo.

The building is expected to be be complete for use in January 2008 when the next cohorts begins.



Techpole.



 




..........................................................................................................................................................................................
AndiamoYouthCooperativeTrust - P.O. Box 314 - Balaka - Tel./Fax 00265 (0) 1545281 - e.mail: info@andiamotrust.org